Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

Canada's Wonderland Discussion Thread


Recommended Posts

Hello everyone!

 

This week, TPR was invited to check out what’s been happening at Canada’s Wonderland since Leviathan’s launch day back in August. Needless to say, a lot has happened since. Andrew (coaster_dude2002) and I were there to bring you the latest and greatest!

 

LEVIATHAN

 

2012 Season Q&A Video - Leviathan & Dinosaurs Alive!

 

 

Construction Tour Part 1 - Below

Construction Tour Part 2

Construction Tour Part 3

Construction Tour Part 4

Construction Tour Part 5

 

The skyline around the park has forever changed with B&M tracks, up to 306ft, piercing the sky. The staff at the park is thoroughly enjoying the construction process as it is taking place by the administration offices, as compared to Behemoth, which took place at the other end of the park. The transformation of this area of the park is astounding and you can feel the buzz and excitement from staff and contractors.

 

The changes in viewing perspective can be really deceiving as to how massive this coaster is. During our tour, we did our best to put it in context next to the coaster that Leviathan seems to be stomping on, Dragon Fire.

 

Milestones:

Last Friday, the crown was lifted into place just before dusk with four cranes. One crane lifted the crown while another pulled the adjoining track piece away just enough to allow the crown to ‘slip’ into place. The last two held the iron workers who bolted everything together. Finishing and detailing work continues this week.

 

All foundation work is done along with utility relocations, allowing contractors to move further ahead with the station area. Just in front of the station, contractors continue to work on the entrance area. A great deal of effort is being placed on theming to the area’s Medieval theme and making the area much more open.

 

It also looks like iron workers have started assembling the lift chain, piece by piece (with the help of machines).

 

Construction is running on schedule. Although winter weather will have the ultimate say, everything is looking great for opening day so far.

 

Upcoming:

This is the first ride that will leave the park gates and have its turnaround in the grassy island pathway outside of the entry plaza. We'll find out if this area will remain open to guests at a later date.

 

That first drop is spectacular, but how high is it? Yes, people know and it is impressive. As far as an exact number, we’ll all have to wait until closer to opening day to find out. We still need at least one thing to debate and look forward to, no?

 

A New Top 2 at CW?

For everyone who’s visited the park and tried all the coasters, what do you think the new top 2 or 3 coasters will be? Just to put things in perspective, the current top 2 coasters at the park based on attendance are Behemoth followed by, wait for it, Dragon Fire.

 

DINOSAUR’S ALIVE!

In addition to Leviathan, rumour had it that dinosaurs are all over the park. Aside from the obvious dino sitting along the 400, this is true. We ran into a few in the strangest of places. Of course, flash photography with a dinosaur doesn’t mix this time of year so we’ll have to wait a little longer to see more of them up close. This is an up charge attraction set at $5.00 CAD with any valid ticket or pass to the park.

 

Dinosaur’s Alive! will create an immersive, interactive and educational experience for a wide variety of groups and guests. This experience is quite exciting for the park as it opens up a wider educational component, beyond physics day, to include the social sciences and history. Groups from as young as grade 2 will benefit right up to engineers studying robotics.

 

Dinosaurs Alive! will begin by the Snoopy Boutique, next to Ghoster Coaster.

 

THANK YOU!

We’d like to thank Dineen and Linsdey in Public Relations for hosting us!

 

Hope you enjoy the update and thanks for visiting. Be sure to check back!

117169089_CWTourJPampAJNov2011-01.thumb.jpg.bbb85c52f17ec900db6e4aa7aa5a4090.jpg

A beautiful day up in Toronto!

637614091_CWTourJPampAJNov2011-02.thumb.jpg.a0dd259d22324d3b5c7d47c096d56dc8.jpg

Even in the off season, this area is quite busy.

498214764_CWTourJPampAJNov2011-03.thumb.jpg.db5892bd09847ceffd885efa721ed346.jpg

At one point, Dragon Fire was all you saw on this side of the parking lot, with Zumba Flume's two drops on the other side.

1746051629_CWTourJPampAJNov2011-04.thumb.jpg.e30efa37cf3cf842a5f6e42b81f94c1b.jpg

These iron workers are coming back down to reset for a different spot on the lift to continue finishing work.

1196734151_CWTourJPampAJNov2011-07.thumb.jpg.715c46e373ab1e9681785c40523a4ad5.jpg

The drop from Jane St.

203935655_CWTourJPampAJNov2011-09.thumb.jpg.27d285475f39ae7cae34b08c629478a4.jpg

The red crane, the tallest used and now fully taken apart, is all done with its duties and will be leaving soon. The parking lot is used to store new car inventory for local dealers during the off season.

1945631821_CWTourJPampAJNov2011-10.thumb.jpg.448c999efe5e0bff72c045ac745597f7.jpg

Track and supports waiting in storage.

1506120060_CWTourJPampAJNov2011-11.thumb.jpg.26f2f2e80d6ee27ea8308d7d154889a0.jpg

The next few shots are a closer look at the finishing work that will be happening over the next week.

158076572_CWTourJPampAJNov2011-13.thumb.jpg.4d752cbcc276e8daa250e48aab027e3a.jpg

1465219871_CWTourJPampAJNov2011-15.thumb.jpg.effd62574bd3e3de722fac8a9bc1bc92.jpg

68622799_CWTourJPampAJNov2011-16.thumb.jpg.a2565480b576d00524285234d9787ba0.jpg

795691511_CWTourJPampAJNov2011-17.thumb.jpg.e9a14bcf3033c6843ce496d080838826.jpg

From up there, they have a fantastic view of the city and...

445184432_CWTourJPampAJNov2011-18.thumb.jpg.56b8390c6ecab4100b8eef09f1b13be5.jpg

...the brake run! Next up, we'll take look at how Leviathan and Dragon Fire will play together...

Edited by rollin_n_coastin
Link to comment
Share on other sites

Leviathan Construction Tour Part 2

 

-Leviathan with Dragon Fire

-A look at the drop

475981880_CWTourJPampAJNov2011-19.thumb.jpg.0323f579fe6818cedb3e0129d0e1b2cb.jpg

Climbing up Dragon Fire's lift will definitely be much more interesting!

534163224_CWTourJPampAJNov2011-20.thumb.jpg.20137afb10e5168fd2f87e19953c4783.jpg

287995055_CWTourJPampAJNov2011-21.thumb.jpg.475fb8546a411698b61d6e7800ab2412.jpg

Wait, where did Leviathan go?

2040764426_CWTourJPampAJNov2011-23.thumb.jpg.a2e488bd0778951f418e44908a46e81f.jpg

Twisty?

282919744_CWTourJPampAJNov2011-24.thumb.jpg.e1e14bf9f8324a5e1c09924297f0fc60.jpg

Yes, that's twisty.

736838483_CWTourJPampAJNov2011-25.thumb.jpg.c14d10b738d0709f1b1f035182bf4517.jpg

Slips right through.

1784065555_CWTourJPampAJNov2011-26.thumb.jpg.8f18faf3d95cfa13bf7b4ed187cf8047.jpg

1980 vs 2011?

142177401_CWTourJPampAJNov2011-28.thumb.jpg.cbec7e438cbd928861b6b11177f1f397.jpg

Corkscrew through Leviathan

1580050587_CWTourJPampAJNov2011-29.thumb.jpg.1f8fb2d0d917cc54ce691589e278f593.jpg

1038398843_CWTourJPampAJNov2011-31.thumb.jpg.9601dd028ce72b0f8d26b5c1ee483762.jpg

Next up, we take a closer look at the first drop, 306ft up there.

76506495_CWTourJPampAJNov2011-37.thumb.jpg.20fbb01217af5d63737ed26b304c0407.jpg

Are you imagining cresting over that yet?

2062067863_CWTourJPampAJNov2011-32.thumb.jpg.8f874d73695938a9d855c9722565618f.jpg

345742641_CWTourJPampAJNov2011-33.thumb.jpg.382755e1569ff511723efc7419b63671.jpg

1397419152_CWTourJPampAJNov2011-35.thumb.jpg.464b8663b40ea90b84e19014337e034c.jpg

635257237_CWTourJPampAJNov2011-34.thumb.jpg.1cdaa6c4946d72df32bd37cb41a2ccd7.jpg

Edited by rollin_n_coastin
Link to comment
Share on other sites

Leviathan Construction Tour Part 3

 

Drop and roll out?

1907155016_CWTourJPampAJNov2011-38.thumb.jpg.ca23e61c342c4c0df88316d6a0917252.jpg

That's the drop. Let's take a look at the whole thing..

418483735_CWTourJPampAJNov2011-39.thumb.jpg.8f65bce3887573c60ccb60d7aecbfbfd.jpg

29468686_CWTourJPampAJNov2011-40.thumb.jpg.dad46870023fc5e0b9439211f96bb6ce.jpg

Game off!

582846506_CWTourJPampAJNov2011-41.thumb.jpg.3d8b72a13017395ca0283113f2a675a1.jpg

Game on!

2032500596_CWTourJPampAJNov2011-42.thumb.jpg.e6d5bbd081c436d5983955c29fd05099.jpg

We'll just swoop up at a modest pace up to...

1998682752_CWTourJPampAJNov2011-43.thumb.jpg.da6e33fb77914d3f4922a44424d596fe.jpg

...here. We can get here fairly easily and quickly.

1484935175_CWTourJPampAJNov2011-44.thumb.jpg.fc3ade85250e38b83aaae1c4ee2bb079.jpg

First, you start here.

1521212883_CWTourJPampAJNov2011-45.thumb.jpg.15c61b9a4cae7ca86f591915d24f65f7.jpg

Then, you end up here at about 92mph.

1570214134_CWTourJPampAJNov2011-46.thumb.jpg.d33ddb751e0596e7df9387d26217e49a.jpg

Continue...

141286474_CWTourJPampAJNov2011-47.thumb.jpg.bb975bb51a5237977b7613ac927a814d.jpg

Twist..

920641289_CWTourJPampAJNov2011-48.thumb.jpg.9d612ebc1931da4b956d6a7e33434167.jpg

..and continue toward the front of the park, outside the main entrance.

2082074323_CWTourJPampAJNov2011-49.thumb.jpg.a09f82fc2a68b5fa584656a8809444e6.jpg

Here's a massive support column waiting to be lifted into place for the barrel role/ over bank turn.

420411362_CWTourJPampAJNov2011-52.thumb.jpg.20c8718ea12644192bda05d5b5a0c9c8.jpg

More track! Work heading toward the front entrance is well underway, starting with that 'little' airtime hill, which will be taller than Flight Deck.

1417769830_CWTourJPampAJNov2011-54.thumb.jpg.b03d11387e4ff52f8de0f280955716d9.jpg

Track heading toward the front entrance of the park.

91773649_CWTourJPampAJNov2011-55.thumb.jpg.77d3ada20c1ffeb1c1fe4f171e9451b8.jpg

Supports are up in between the trees. The park's priority is ensuring that no trees are removed unless absolutely necessary.

4829802_CWTourJPampAJNov2011-56.thumb.jpg.df77eb9b1f5621ec05e40367090e7a92.jpg

More supports waiting for track.

265975782_CWTourJPampAJNov2011-57.thumb.jpg.9010a02983ef3ce69b7f6cadc566089a.jpg

Moving further toward the front gate area, footings are being prepped for their supports.

871650054_CWTourJPampAJNov2011-58.thumb.jpg.d7145bd187c312d081879306eb3e0f23.jpg

1205798937_CWTourJPampAJNov2011-60.thumb.jpg.66a01ee7f2c698942bcf25d6655d54f1.jpg

This one looks ready.

1681805194_CWTourJPampAJNov2011-59.thumb.jpg.2246fd8b807f0fc04d1f957f397a7278.jpg

One last look here. Next up, heading to the station area.

Edited by rollin_n_coastin
Link to comment
Share on other sites

Leviathan Construction Tour Part 4

 

The station and ride entrance area.

4513743_CWTourJPampAJNov2011-61.thumb.jpg.bbb50ef9abca61c7aa1cff44ef00d1e7.jpg

Heading toward the station area, there are a few cool things to check out. The chain, which was being stored under Dragon Fire's station has moved to bigger and better things--it's being put together, one piece at a time. Let's see what's in that open container?

266241399_CWTourJPampAJNov2011-62.thumb.jpg.92dfd206d6a427f5900b4e8e23690f40.jpg

The bolts holding this coaster both upright and together are substantial I'd say.

1251345684_CWTourJPampAJNov2011-63.thumb.jpg.dd29d6b089841f81a1407730249fbf02.jpg

For all of you footer fans out there, this form's for you.

580155213_CWTourJPampAJNov2011-64.thumb.jpg.ce690501d811a14304d3ed2b724c98b9.jpg

Let's take a look at the transfer track area.

1840282265_CWTourJPampAJNov2011-65.thumb.jpg.95ce413d90ed66f63fe5de3eff9ae772.jpg

538834370_CWTourJPampAJNov2011-66.thumb.jpg.9842f2a5a4cbf1c4df35cedcb4afe31e.jpg

333077436_CWTourJPampAJNov2011-67.thumb.jpg.0b12ab4dd96617f1ced5649812cc9975.jpg

Finishing work continues on the lift hill.

1505489979_CWTourJPampAJNov2011-68.thumb.jpg.02ea598bb270e7f1f3c2a847f382d4ed.jpg

590972470_CWTourJPampAJNov2011-69.thumb.jpg.0628a81dd7a771d0b8612106f690eadf.jpg

Ready to climb up?

1510786107_CWTourJPampAJNov2011-70.thumb.jpg.21e0b5e436d9827ed47b3c399ccb7559.jpg

Station foundation is done.

2062957772_CWTourJPampAJNov2011-71.thumb.jpg.380568c6f283bde2df99dea92330f988.jpg

Hey motor lovers....

347855106_CWTourJPampAJNov2011-72.thumb.jpg.fb0e20aeb8aeadc36f2b2249d8ab0b3d.jpg

The station. About 30% shorter than Behemoth's.

578323696_CWTourJPampAJNov2011-73.thumb.jpg.d9e2901cb004c78dde1ab93d37f9b1ca.jpg

Work continues at the entry/ queue area. The theming will bring this area back to its Medieval roots.

2005743232_CWTourJPampAJNov2011-74.thumb.jpg.d45a9a236212e4a59d5bb3316289834d.jpg

We didn't leave the tour without a memento of sorts. 2'' of mud just doesn't come off ;) Bonus section coming up!

Edited by rollin_n_coastin
Link to comment
Share on other sites

Leviathan Construction Tour Part 5

 

While Leviathan is under contsruction, park staff are busy with off season maintenance, rebuilding rides and hiding dinosaurs from our (camera's) view. Here are some that are being worked on in the picnic area, next to Leviathan and Dragon Fire.

 

On the administrative side, the holiday season brings a slow down just before things fiercly pick up in January, starting with recruiting an army of seasonal staff for the 2012 season.

 

Thanks for following along!

754749384_CWTourJPampAJNov2011-75.thumb.jpg.e5f610292508f9fea3876423db54d3e7.jpg

Drop Tower at peace until May.

956617826_CWTourJPampAJNov2011-76.thumb.jpg.48f55c90297310a8e92ffb1a61606e23.jpg

Anyone else really liking the original logo on the trains?

771767536_CWTourJPampAJNov2011-77.thumb.jpg.cd3609d7a2e1f23ae8ad601818bb7770.jpg

These are trains from The Mighty Canadian Minebuster.

278704298_CWTourJPampAJNov2011-78.thumb.jpg.ee8f76d5f4d172b584f845a40a2ccabd.jpg

Here are Thunder Run's trains.

1403408739_CWTourJPampAJNov2011-79.thumb.jpg.4a253cfd6338839475ddaa777f49ee90.jpg

Dragon Fire waiting its turn.

2126047552_CWTourJPampAJNov2011-81.thumb.jpg.b73ec81bb944b150005eeda49e0a19ba.jpg

The Bat and Drop Tower in the skyline.

689454820_CWTourJPampAJNov2011-80.thumb.jpg.a8ad36a177d179f5bb54efe102fe1903.jpg

Oh, and let's not forget to take a look at the other side of the park. An airtime machine at rest.

1424496185_CWTourJPampAJNov2011-82.thumb.jpg.fec5b5153a5051029dce361eba86b651.jpg

Phew, glad they turned the water off before the pipes freeze!

Edited by rollin_n_coastin
Link to comment
Share on other sites

Fantastic update and report, as usual, Jason. I've never been to this park but from what I see, even people walking on the parking lot will have an awesome view. What part of the layout are those footers near the trees the park has cleverly decided to keep ? a tall part of the track or more "close to the ground" ? In any case, it will be fun th see trains flying by in the morning arriving at the park, or going back to your car... it's definitely not a parking lot coaster, but due to its size, I expect it to be a show in itself even from outside the park.

Link to comment
Share on other sites

Very awesome tour... thanks guys!

 

On the topic of the chain lift from a couple pages back, do we actually know that the chain lift on this thing will be as slow as the "normal" B&M chain lifts? This is their first coaster of this kind, after all... so why not their first "faster" lift to go along with it! You'd think they would want it to be quicker anyways to keep the ride capacity reasonable.

 

One other question thing not specific to Leviathan but somewhat related... why does B&M always have the "fence" under the lift and brake runs? It is for safety to catch someone in the unfortunate event they might fall during an evacuation? No other manufacturer does this, correct?

Link to comment
Share on other sites

^ You mean this?

 

I think it's only used for when the track is going over a public section like a midway, other ride, or public road. Take Goliath (below) for example. I'm pretty sure the sections of track that goes over the road has this fence maybe for safety? Just in case someone drops an item, the fence is used to possibly catch the loose items instead of them dropping onto a person below, but I may be wrong. It could just be B&Ms way of establishing that the ride is over something of importance.

xx.thumb.jpg.b0375388375cdf5006c6a0faffa29a9c.jpg

Edited by Bryce232
Link to comment
Share on other sites

^^This is in no way an official answer, but I'd guess it is there to catch anything that could fall during these parts. People on the ride are most likely to have things out during these parts of the ride as well as maintenance workers. Having the nets stops anything from falling from these portions of the ride to the area below.

 

Edit: ^Beat me to it.

Link to comment
Share on other sites

Very awesome tour... thanks guys!

 

On the topic of the chain lift from a couple pages back, do we actually know that the chain lift on this thing will be as slow as the "normal" B&M chain lifts? This is their first coaster of this kind, after all... so why not their first "faster" lift to go along with it! You'd think they would want it to be quicker anyways to keep the ride capacity reasonable.

 

Seeing as the approx. ride time is 3:28, and the POV from top of lift hill to brakes is only 1:12 (though simulations aren't perfect), I'd say there's a good chance it'll be a slow lifthill.

Link to comment
Share on other sites

Ya know, I wouldn't be shocked if Dragon Fire is on the way out. I mean, look how much it is dominated!

The same kind of effect happened to Backlot when Behemoth came to town... and the overall appearance of the ride itself makes it look like it's in worse shape than Dragon Fire. I think the way that Leviathan stomps on Dragon Fire was kind of intentional.

 

On the topic of the lift hill speed, I don't think the speed will be increased for Leviathan. I'm sure by the time one train is off of the lift, they're going to have another one dispatch so the speed of the lift will have to be slow enough to allow the first train to run through the course by the time the next one is nearing the top.

Link to comment
Share on other sites

Very awesome tour... thanks guys!

 

On the topic of the chain lift from a couple pages back, do we actually know that the chain lift on this thing will be as slow as the "normal" B&M chain lifts? This is their first coaster of this kind, after all... so why not their first "faster" lift to go along with it! You'd think they would want it to be quicker anyways to keep the ride capacity reasonable.

 

Seeing as the approx. ride time is 3:28, and the POV from top of lift hill to brakes is only 1:12 (though simulations aren't perfect), I'd say there's a good chance it'll be a slow lifthill.

 

That time includes dispatch/loading time, which could take a 1:30. I think the lift should be around a minute long since the newer B&M hypers go up their steep lifts fairly fast.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/