I just returned home from Cedar Point. I was a bit hesitant to make the trip up there after hearing all of the poor opening weekend reports, but overall it was a GREAT day. The park was clean, ops were enthusiastic & efficient and lines were short. All coasters were operational except for Wicked Twister. As reported above, the WT train was completely on the track with most parts on the train. Hopefully this is a sign that testing will begin soon. Millennium Force was still on two train operation with the yellow train missing from the track. Gemini was also at reduced capacity, only the red side was running. Dragster was up and down all day. Nothing new there.
I was able to take my first spin on the "new" coaster, Rougarou. Personally, I think that converting Manits into Rougarou was a FANTASTIC choice. Rougarou is quite comfortable, fun and exciting. As others have reported the trim is off, and the ride hauls through the course. The refreshed Wicked Twister midway is also looking nice. All relocated rides were operational and open for guests today.