Jump to content
  TPR Home | Parks | Twitter | Facebook | YouTube | Instagram 

bgeguy

Members
  • Posts

    288
  • Joined

  • Last visited

bgeguy's Achievements

Community Regular

Community Regular (8/14)

  • First Post
  • Collaborator
  • Week One Done
  • One Month Later
  • One Year In

Recent Badges

1

Reputation

  1. Griffon had a "sneak preview week" prior to its grand opening as well.
  2. Everyone keep in mind that when Anheuser-Busch InBev was exploring the sale of the parks Six Flags stuck their toes in the water as well.
  3. Maybe, but Cheetah Hunt's viral campaign technically began in June, not September.
  4. Cheetah Hunt is looking fantastic and looks to be an enjoyable ride. Has anyone else noticed that the concrete brick trench walls have been painted a tan color?
  5. ^That sign has absolutely nothing to do with this project, it's been there for years and years and is just a themed version of an "authorized personnel only" sign.
  6. Busch Gardens has filed for a standard character trademark for Verbolten! http://tess2.uspto.gov/bin/showfield?f=doc&state=4007:tq562.2.2
  7. That tree has actually been there since before construction even began.
  8. In regards to the SeaWorld coaster, that $10 million is most likely a lump sum amount that would be paid to the contractor, and not the cost of the designing and manufacturing of the coaster itself.
  9. James City County held a Planning Commission meeting this evening. In the public comments section on special user permits, Larry Giles of Busch Gardens spoke and revealed the following... -The first launch goes into the "event building" -It will use the same station as Big Bad Wolf -Will follow a similar path as the Big Bad Wolf heading towards the station -Satellite picture diagram showed a "themed bridge" near the former final brake run of Big Bad Wolf
  10. I think what they mean by the description is that it's themed to the Black Forest, but the speed and idea of a launch coaster was inspired by the Autobahn, and may not be a part of the storyline.
  11. Das Katapult is currently in pieces sitting in the employee parking lot. The queue house floor/deck has been completely destroyed (making me believe the actual covering will be reused) and there is a HUGE hole where Katapult was.
×
×
  • Create New...

Important Information

Terms of Use https://themeparkreview.com/forum/topic/116-terms-of-service-please-read/