I hit the park on Friday and this is some of the things I observed:
I got the the park around 1PM. Tidal Wave was the only ride advertised as down, although X2 was visibly not running when we got there. The park was not too crowded which was an added plus.
-Tatsu did not run the majority of the day. I saw empty trains sent out very rarely, but I'm not sure if ever actually opened. The park was only open until 8.
-Apocalypse was running two trains. Yes the ride was a bit jarring, but I survived.
-TNR also was not open the first half of the day. We happened to walk by around 4PM and noticed a small line form near the carousel. They were testing the ride. They opened it about ten minutes later. I tried it with the VR. It was cool, but overall, I just enjoyed the ride without the OTSR, which is the most important part to me.
-Goliath had a very large line around 1PM, but was a near walk-on come 5PM.
-Twisted Colossus ran three trains all day and the line never left the main queue area. I noticed the ride ops would give warnings such as "30 seconds to race."
-Scream was running two trains. I tried the new refurbished train, but it still rattles way too much. I don't care for this ride any more.
-X2 eventually opened in the day and I got two rides on it.
-Ninja was running two trains and had a decent line for the majority of the day. While on Ninja, I noticed a boat stuck on the hill of Jet Stream with mechanics looking at it. I don't think it reopened.
-FT ran fine with two trains all day. No visible issues.
-I walked by the construction area, but didn't notice anything new.
I skipped GL, Batman, Riddler, Viper, Goldrusher, Lex, and Superman.