Djurs Sommerland

From 3rd December

Behind the drapes they're carving out the skull

The pirate fortress is continuing to take form

8th December, the lifthill catwalk, most of the swoop and the drop into the tunnel has been erected

View over the fortress, skull, coaster part and the splash down





think you are right, what i like mostly about the pictures is the frozen look of this two coastertracks




